Post Engineering ChangesApplication Overview
The Post Engineering Changes application transfers engineering changes from the Change File to the Product Structure File. This enables the user to design modifications to a product structure long before they are to be implemented. The Product Structure File itself (and therefore the production process) is not altered until the changes are posted through this application. Changes to be posted may be selected by entering a range of engineering change numbers and/or by setting a cutoff date for the effective date assigned to each change by the user. The application will flag changes that are inconsistent with the current product structures. Despite this, it is recommended to print out the edit list in Engineering Change Processing before posting.
Run Instructions
Select Post Engineering Changes from the pull down BOMP Processing window. The following screen will then be displayed:
Post Engineering Changes Entry Screen
The following options are available:
* Select the desired mode from the Post Engineering Changes menu bar. * Enter the data requested on the screen.
To return to the menu bar, press the ESC or F10 key. To leave this application, press X for EXIT when positioned at the menu bar.
Entry Field Descriptions
Post Engineering Changes
E N G I N E E R I N G C H A N G E R E G I S T E R
Ranges: All Changes Thru Effective Date 12/01/92
Change No Change Description Parent Item Parent Description Effective Date
9002 CPU Information change. May PC Parent Item (Mother Board) 04/27/92 redirect operation option if Personal Computer necessary. Status is optional.
Seq Action Component Item Qty Per Um Component Description Llc Attch Scrap Act Stk Ctl P/M Eff Date Posting Note
10 C CPU 1.000000 EA Mother Board For Parent 1 30 .0 A Y Y M 00/00/00 Changed Central Processing CPU 386 operation position 30. Maintain inspection status for sub‑assembly CPU. Operation position is portable as needed. Inspection operation may need additional queue.
1 Changes Posted
|