![]() |
Engineering Change History ReportApplication Overview
The Engineering Change History Report prints a record of engineering changes made to parent items in the Product Structure File through Engineering Change Processing and the Post Engineering Changes applications.
It provides information about each change, including the engineering change number; description of the change and which sequence numbers and components were affected. Also provided are the date the change was supposed to become effective and the date it was posted. The user may choose to print the report and to purge the Engineering Change File. Changes to be included in the report may be selected by change number and/or parent item number. The user may also set a cutoff date for changes posted to the Product Structure File. Any changes posted after the cutoff date will be excluded from the report.
Run Instructions
Select Engineering Change History Report from the pull down BOMP Reports window. The following screen will then be displayed:
Engineering Change History Report
The following options are available:
* Select the desired mode from the Engineering Change History Report menu bar. * Enter the data requested on the screen.
To return to the menu bar, press the ESC or F10 key. To leave this application, press X for EXIT when positioned at the menu bar.
Entry Field Descriptions
Engineer Change History Report
E N G I N E E R I N G C H A N G E H I S T O R Y R E P O R T
Ranges: All Changes All Parent Items All Dates Posted
Change No Change Description Parent Item Parent Description Effective Date Date Posted
9001 CPU Information change. May PC Parent Item (Mother Board) 02/25/92 02/25/92 redirect operation option if Personal Computer necessary. Status is optional.
Seq Action Component Item Qty Per Um Component Description Llc Attch Scrap Act Stk Ctl P/M Eff Date Posting Note
10 C CPU 1.000000 EA Mother Board For Parent 1 30 .0 A Y Y M Changed Central Processing CPU 386 operation position 30. Maintain inspection status for sub‑assembly CPU. Operation position is portable as needed. Inspection operation may need additional queue.
1 Changes Printed
|